High Strength Forged Steel Train Wheel | AAR UIC EN Standard Railway Wheel for Locomotive Freight Wagon Passenger Coach

We are a professional manufacturer of forged steel train wheels with 20+ years of experience, compliant with AAR, UIC, EN

Categories:

Product Details

Product parameters 

Item

Specification

Product name

Forged Steel Train Wheel / Railway Wheel

Applicable models

Locomotive, Freight Wagon, Passenger Coach, Metro, Mine Rail Vehicle

Standard

AAR M-107, UIC 811-1, EN 13262, GOST, TB/T 2945, BS, JIS

Material

CL60, ER6, ER7, ER8, ER9, R7T, R8T, R9T High Quality Carbon Steel

Craftsmanship

Whole Forged (Heat Treatment: Quenching + Tempering)

wheel diameter

Ø500–1250 mm (Customized Available)

Rim width

135–140mm

Rim height

27–32mm

medial distance

1353±2 mm (Standard Gauge 1435 mm)

Hardness

280–350 HB (Tread Surface)

Axle load

12–35 Tons

Flaw detection

100% UT (Ultrasonic Test) + MT (Magnetic Particle Test)

 

Product Overview

We are a professional manufacturer of forged steel train wheels with 20+ years of experience, compliant with AAR, UIC, EN, TB/T international standards. Our train wheels are made from high-purity carbon steel (CL60/ER7/ER8), processed by precision forging, advanced heat treatment and CNC machining, featuring high hardness, excellent wear resistance, anti-fatigue, anti-cracking performance, widely used for railway locomotives, freight wagons, passenger coaches, metro and industrial rail vehicles.

 

Product Advantages

•Premium Material: Adopt high-strength forged steel, strict chemical composition control, low P&S impurity

•Precision Forging: Closed-die forging process, dense metal structure, high mechanical strength

•Perfect Heat Treatment: Quenching + tempering, uniform hardness, good toughness at low temperature

•Strict Inspection: Full UT/MT non-destructive testing, dimensional accuracy ≤0.02 mm

•Customization: Support customized diameter, profile, material, and various gauge standards

•Long Service Life: Wear-resistant tread, stable performance, reduce maintenance frequency

 

Manufacturing Process

Steel Billet → Cutting → Heating → Forging → Heat Treatment → Rough Machining → Semi-finish Machining → Finish Machining → Hardness Test → Dynamic Balance Test → UT/MT Inspection → Packaging

 

Applications

♦Railway Locomotives: Diesel locomotives, electric locomotives

♦Freight Wagons: Open-top wagons, box wagons, tank wagons

♦Passenger Coaches: Ordinary passenger trains, high-speed trains

♦Urban Transit: Metro, light rail, tram

♦Industrial & Mining: Mine locomotives, port shunting vehicles, factory rail cars

 

Packing & Shipping

►Packaging: Standard seaworthy wooden case, anti-rust treatment, fixed with steel bracket

►MOQ: 1 PC (Sample), 10 PCs (Bulk Order)

►Lead Time: 15–30 days (Customized 30–45 days)

►Shipping: By sea (FOB Shanghai/Ningbo)

Online Inquiry

You can contact us at any time, and we will provide tailored solutions in a timely manner.

Related Products

Consult immediately

You can contact us at any time, and we will provide tailored solutions in a timely manner.

Submit